                            1. General Requirements
	1.1 The Typical Equipment Layout is based upon UOP Standard Specification 9-51, Plot Plan Design Criteria for Process Units.  The priority for documentation interpretation is:
		a. This Project Specification, including Section 3 “Additional Requirements” and Section 4 “Guidelines”.  Unless noted otherwise, each point in the “Additional Requirements” section is mandatory and shall be incorporated into the final plot plan.
		b. The suggested typical equipment arrangement shown on the UOP Typical Equipment Layout Drawing.
		c. The plot plan guidelines described in UOP Standard Specification 9-51.
	1.2 The UOP Typical Equipment Layout drawing is a non-project specific, generic, arrangement of the major process equipment typically included in this process.  It is NOT intended to reflect the specific equipment used in, or the plot area available f...
	1.3 There may be differences between the equipment required for this project and the equipment shown on the UOP Typical Equipment Layout Drawing.  The Contractor's plot plan shall incorporate the specific requirements (e.g., free draining, equipment r...
2. Review of Contractor’s Plot Plan
	2.1 UOP will perform a single review of the Contractor’s proposed plot plan.  One copy of the Contractor's first complete plot plan may be sent to UOP at the following address:
	2.2 The Contractor's plot plan shall be submitted in the English language, and early enough for the Contractor to act upon UOP's comments without additional cost to the Owner.  The plot plan drawing must be of good quality, suitable for microfilming. ...
	2.3 After receipt of the Contractor's plot plan, UOP will review the drawing(s) for process related features.  One copy, containing UOP’s comments and marked "reviewed", will be returned.
3. Additional Requirements
4. Guidelines
                        
Document Text Contents
Page 1

Revision
Indication



UOP LLC
25 East Algonquin Road
Des Plaines, Illinois 60017-5017 USA

PROJECT SPECIFICATION

974901 — 999 SHEET 1




TYPICAL EQUIPMENT LAYOUT







999- 301- 1 999-5 Form QUA-04-5







Other specifications UOP Standard Specification: 9-51
referenced in this UOP Standard Drawing:
specification: UOP Project Specification: 974901-112 UOP Drawing: GA30001-Rev-00

REV DATE BY APVD REV DATE BY APVD

0 10Jul13 AM PG
1 08NOV13 SM PKG





N
ot

e:
T

he
in

fo
rm

at
io

n
in

th
is

d
oc

um
en

t i
s

co
nf

id
en

ti
al

a
nd

th
e

pr
op

er
ty

o
f U

O
P

L
L

C
a

nd
m

us
t n

ot
b

e
di

sc
lo

se
d

to
o

th
er

s
or

r
ep

ro
du

ce
d

in
a

ny
m

an
ne

r
or

u
se

d
fo

r
an

y
pu

rp
os

e
w

ha
ts

oe
ve

r
w

it
ho

ut
it

s
w

ri
tt

en
p

er
m

is
si

on
.


Fixed-Bed Platforming Process Unit

974901
A typical equipment layout for this unit is shown on the following UOP Drawing:

974901-999-03-ga30001-Rev-00 Typical Equipment Layout – CCR Platforming Process Unit



1. General Requirements


1.1 The Typical Equipment Layout is based upon UOP Standard Specification 9-51, Plot Plan

Design Criteria for Process Units. The priority for documentation interpretation is:


a. This Project Specification, including Section 3 “Additional Requirements” and
Section 4 “Guidelines”. Unless noted otherwise, each point in the “Additional
Requirements” section is mandatory and shall be incorporated into the final plot
plan.


b. The suggested typical equipment arrangement shown on the UOP Typical

Equipment Layout Drawing.


c. The plot plan guidelines described in UOP Standard Specification 9-51.

1.2 The UOP Typical Equipment Layout drawing is a non-project specific, generic,

arrangement of the major process equipment typically included in this process. It is NOT
intended to reflect the specific equipment used in, or the plot area available for, the subject
process unit for any project. The drawing provides a suggested equipment layout that
conforms to accepted good practice and incorporates the critical relationships between
major equipment that affect process performance, as described in the “Additional
Requirements” section of this specification.


1.3 There may be differences between the equipment required for this project and the

equipment shown on the UOP Typical Equipment Layout Drawing. The Contractor's plot
plan shall incorporate the specific requirements (e.g., free draining, equipment relative
locations) and equipment shown on the UOP Piping and Instrument Diagram and the UOP
Project Specifications. UOP Project Specification 112 - Equipment List, indicates the
specific equipment required for this project.

Page 2

Revision
Indication



UOP LLC
25 East Algonquin Road
Des Plaines, Illinois 60017-5017 USA

PROJECT SPECIFICATION

974901 — 999 SHEET 2



TYPICAL EQUIPMENT LAYOUT







999-301-1 999-5 Form QUA-04-5







REV DATE BY APVD REV DATE BY APVD

0 10Jul13 AM PG






N
ot

e:
T

he
in

fo
rm

at
io

n
in

th
is

d
oc

um
en

t i
s

co
nf

id
en

ti
al

a
nd

th
e

pr
op

er
ty

o
f U

O
P

L
L

C
a

nd
m

us
t n

ot
b

e
di

sc
lo

se
d

to
o

th
er

s
or

r
ep

ro
du

ce
d

in
a

ny
m

an
ne

r
or

u
se

d
fo

r
an

y
pu

rp
os

e
w

ha
ts

oe
ve

r
w

it
ho

ut
it

s
w

ri
tt

en
p

er
m

is
si

on
.


2. Review of Contractor’s Plot Plan


2.1 UOP will perform a single review of the Contractor’s proposed plot plan. One copy of the

Contractor's first complete plot plan may be sent to UOP at the following address:


UOP LLC
25 East Algonquin Road
Des Plaines, Illinois 60017-5017, USA

Attention: Project Document Review Coordination (Bin A15)


2.2 The Contractor's plot plan shall be submitted in the English language, and early enough for

the Contractor to act upon UOP's comments without additional cost to the Owner. The plot
plan drawing must be of good quality, suitable for microfilming. Transmittal letters
accompanying the plot plan shall reference the UOP Project Number.


2.3 After receipt of the Contractor's plot plan, UOP will review the drawing(s) for process

related features. One copy, containing UOP’s comments and marked "reviewed", will be
returned.


3. Additional Requirements


The following points are mandatory and shall be incorporated into the final plot plan.


3.1 The Charge and Interheaters are a minimum distance from the reactors to minimize the

reactor circuit alloy piping requirements and compressor utilities.

3.2 The Combined Feed Exchanger should have a minimum pipe run into the Charge Heater.


3.3 The distance from the fired heaters to the Separator should be maximized for fire safety.

However, the linear (and equivalent) feet of the reactor circuit piping should be
minimized to minimize compressor utilities.


3.4 The Separator and Recontact Drums should be located close to Net Gas Compressors.


4. Guidelines


The following points are guidelines and are to be considered during development of the final plot
plan.


4.1 There should be access to the Reactor structures for catalyst loading using a crane.


4.2 The Debutanizer shall be located for best orientation relative to the reboiler fired heater

and the overhead air cooled condenser.