Download Specification for Pipe Support PDF

TitleSpecification for Pipe Support
File Size2.8 MB
Total Pages330
Document Text Contents
Page 1

Pagee 1 of 22













DOCUMENT NO:
60-0000-L-SPE-0002
DOCUMENT TITLE:
SPECIFICATION FOR

PIPE SUPPORTS



ДОКУМЕНТ №
60-0000-L-SPE-0002
НАИМЕНОВАНИЕ
XXXXX






TENGIZCHEVROIL
PFD Project No. 571500


ТЕНГИЗШЕВРОЙЛ
PFD Проект № 571500





4 29/06/05 22 RE-ISSUED FOR CONSTRUCTION PO BW SM RH

3 12/07/04 21 RE-ISSUED FOR CONSTRUCTION PO BW SM DB

2 28/01/04 21 RE-ISSUED FOR CONSTRUCTION PO BW MB DB

1 10/04/03 19 RE-ISSUED FOR CONSTRUCTION PO BW MB JH

0 22/08/02 18 ISSUED FOR CONSTRUCTION PO BW MB JH

REV DATE PAGES DESCRIPTION BY CHKD APPR CLIENT

ИЗМ. ДАТА СТР. ПОЯСНЕНИЯ ИСП. ПРОВ. УТВ. ЗАКАЗЧИК

Page 2

TENGIZCHEVROIL ASSET DEVELOPMENT PROJECTS PFD
PROJECT №. 571500

SPECIFICATION FOR PIPE SUPPORTS


DOC №. : 60-0000-L-SPE-0002
Rev. 4



Pagee 2 of 22

REVISION DESCRIPTION SHEET

REV. PARA. REVISION DESCRIPTION
4 4.2 NSPS MATERIAL REVISED

4 8 COLD CONSERVATION INSULATION THICKNESS TABLE REVISED TO INCLUDE COLD PERSONNEL PROTECTION
4 10 NOTES REVISED


ATTACHMENTS

SHEET NO.


4 A15, A18 PIPE SIZE RANGE REVISED
4 A32 SUPPORT NUMBER REVISED
4 A34 - A36 NEW PIPE SUPPORTS
4 B7 PIPE SIZE RANGE REVISED
4 B50 - B57 NEW PIPE SUPPORTS
4 C3 PIPE SIZE RANGE REVISED
4 C5 SUPPORT REVISED FOR TRUNNION SIZES 18” - 24”
4 C12, C13 NOTE ADDED TO DRAWING
4 C15, C18, C19 SUPPORT REVISED FOR TRUNNION SIZES 18” - 24”
4 D30 - D34 NEW PIPE SUPPORTS
4 E40 NOTE REVISED
4 E44 DIMENSION REVISED
4 E51 NEW PIPE SUPPORT
4 F16, F20, F21 PIPE SIZE RANGE REVISED
4 F32, F33 DIMENSION REVISED
4 F36 – F39 PIPE SIZE RANGE REVISED
4 F40 DETAIL REVISED
4 F43 – F49 NEW PIPE SUPPORTS
4 G12 THREADED BAR LENGTH REVISED
4 H9 TRUNNION END PLATE REVISED
4 H23, H24 DIMENSION REVISED
4 J1- J13 GENERAL REVISION OF SELECTION SHEETS

Page 165

TENGIZCHEVROIL ASSET DEVELOPMENT PROJECTS PFD

CONTRACT No 571500
SPECIFICATION FOR PIPE SUPPORTS DOC No 60-0000-L-SPE-0002

Rev. 0

SUPPORT No SH21, SH22
SUPPORT TYPE Spring Hangers for Cold Insulated Pipes
PIPE SIZE 2"- 36"

Sheet D30

Detail No

Assembly Tag No: - SH21 or SH22 Dimensions Required: - H

For Details of Spring
Hangers Refer to
Spring Spec No
60-0000-L-SPE-1003

Item No (Ref Spring Spec) is also required

View X-X

X

X

H

X

X

H

SH21 SH22

Page 166

TENGIZCHEVROIL ASSET DEVELOPMENT PROJECTS PFD
CONTRACT No 571500

SPECIFICATION FOR PIPE SUPPORTS DOC No 60-0000-L-SPE-0002
Rev. 0

SUPPORT No SH10
SUPPORT TYPE Spring Hangers from Underside of Steel to Pipe Elbow.
PIPE SIZE All Sizes

Sheet D31

Detail No

Assembly Tag No: - SH10 Dimensions Required: - H
Item No (Ref Spring Spec) is also required

H

View A-A

For Details of Spring
Hangers Refer to
Spring Spec No
60-0000-L-SPE-1003

A

A

Page 329

TENGIZCHEVROIL ASSET DEVELOPMENT PROJECTS PFD
CONTRACT No 571500

SPECIFICATION FOR PIPE SUPPORTS DOC No 60-0000-L-SPE-0002
Rev. 1

ATTACHMENT G - PIPE SUPPORT SELECTION CHART (FOUNDATION TYPES) SHEET No. J12

Pipe Support Foundation for
New Paving. F8N-2
Pipe Size-All Sizes. Sheet G2 & G3

Pipe Support Foundation for
New Paving. F8N-1
Pipe Size-All Sizes. Sheet G1 & G3

Pipe Support Foundation for posts
Unpaved Areas, Light Loads. F9-1
Pipe Size-All Sizes. Sheet G4,G5

Pipe Support Foundation for posts
Unpaved Areas, Heavy Loads. F9-2
Pipe Size-All Sizes. Sheet G6,G7

Pipe Support Foundation for trunnions
Unpaved Areas, Light Loads. F9-4
Pipe Size-All Sizes. Sheet G8,G9

Pipe Support Foundation for trunnions
Unpaved Areas, Light Loads. F9-4
Pipe Size-All Sizes. Sheet G10,G11

Pipe Support Foundation from
Existing Civil Plinth (post). F8N-4
Pipe Size-All Sizes. Sheet G13

Pipe Support Foundation from
Existing Civil Plinth (Trunnion). F8N-3
Pipe Size-All Sizes. Sheet G12

Pipe Support foundation for non
paved areas for 2" & 3" trunnions and
welded posts HEA 100
F9-6
Pipe Size-All Sizes. Sheet G14

Pipe Support foundation for non paved
areas for 4" & 6" trunnions
F9-7
Pipe Size-All Sizes. Sheet G15

Pipe Support foundation for non paved
areas for 8",10' & 12" trunnions
F9-8
Pipe Size-All Sizes. Sheet G16

Pipe Support foundation for non
paved areas for welded posts
HEA160 & HEA200
F9-9
Pipe Size-All Sizes. Sheet G17

Pipe Support foundation for non
paved areas for Small Bore Pipe
Supports and 70 x 8 Angle Posts
F9-10
Pipe Size-1/2" -2". Sheet G18

Page 330

TENGIZCHEVROIL ASSET DEVELOPMENT PROJECTS PFD
CONTRACT No 571500

SPECIFICATION FOR PIPE SUPPORTS DOC No 60-0000-L-SPE-0002
Rev. 1

ATTACHMENT H - PIPE SUPPORT SELECTION CHART (COLD SHOES, GUIDES, LINE STOPS, HANGERS, TRUNNIONS) SHEET No. J13



Cold Shoe - Standard Length
CS1.
Pipe Size ¾"-24". Sheet H1

Cold Shoe - Long.
CS2.
Pipe Size 4"-24". Sheet H2

Cold Anchor Shoe - 800 Lg.
CAS1.
Pipe Size 12" - 24". Sheet H4

Directional Anchor for Cold Insulated
Pipe. CDA1
Pipe Size ¾" - 3". Sheet H5

Directional Anchor for Cold Insulated
Pipe. CDA1
Pipe Size 4" - 24". Sheet H5

Non-Adjustable Hanger for Cold
Insulated Pipe. CH2
Pipe Size ¾" - 24". Sheet H6 & H7

Cold Anchor Shoe - 600 Lg.
CAS1.
Pipe Size ¾" - 10". Sheet H4

Base Support for Cold
Insulated Pipe. CBS1
Trunnion Size 2" - 16". Sheet H8

Trunnion Support for Cold
Insulated Pipe. CTS1
Pipe Size 2" - 24". Sheet H9

Cold Double Shoe - Std. Length
CS3
Pipe Size 8" 24". Sheet H3

4-Directional Vertical Guide for Cold
Insulated Pipes. CVG1,CVG2,CVG3.
Pipe Size 8" - 24". Sheet H10 & H11

2-Directional Vertical Guide for Cold
Insulated Pipes. CVG4,CVG5,CVG6.
Pipe Size 8" - 24". Sheet H12 & H13

Hold Down for Uninsulated Pipe.
HD1.
Pipe Size ¾" - 11/2". Sheet H14

Hold Down for Uninsulated Pipe.
HD1.
Pipe Size 2" - 12". Sheet H15 & H16

Hold Down Guide for Uninsulated
Pipe. HD2.
Pipe Size 2" - 12" Sheet H17 &
H18

Hold Down for Insulated Pipe
HD3.
Pipe Size 1" - 12" Sheet H19 & H20

Slotted Hold Down for Uninsulated
Pipe. HDS1.
Pipe Size 2" - 12". Sheet H21 & H22

Slotted Hold Down for Uninsulated
Pipe. HDS2.
Pipe Size 2" - 12" Sheet H23 &
H24

Anchor Strap for Uninsulated
Galvanised Pipe. AS1.
Pipe Size 1½" - 8" Sheet H25 & H26

Similer Documents