Page 1

DAFTAR HARGA SATUAN UPAH

No. Uraian Satuan Kode

1 2 3 4 5 6
1 Buruh Tak Terampil OH U.1 85,000.00
2 Buruh Semi Terampil OH U.2 90,000.00
3 Buruh Terampil OH U.3 95,000.00
4 Pekerja OH U.4 85,000.00
5 Mandor Pekerja OH U.5 150,000.00
6 Tukang Batu OH U.6 130,000.00
7 Kepala Tukang Batu OH U.7 140,000.00
8 Tukang Kayu OH U.8 130,000.00
9 Kepala Tukang Kayu OH U.9 140,000.00

10 Tukang Besi Beton OH U.10 130,000.00
11 Kepala Tukang Besi Beton OH U.11 140,000.00
12 Tukang Las OH U.12 140,000.00
13 Kepala Tukang Las OH U.13 150,000.00
14 Tukang Politur OH U.14 130,000.00
15 Tukang Cat OH U.15 130,000.00
16 Kepala Tukang Cat OH U.16 140,000.00
17 Tukang Pipa OH U.17 130,000.00
18 Pemecah Batu OH U.18 85,000.00
19 Jaga Malam OH U.19 85,000.00
20 Penggergaji OH U.20 85,000.00
21 Penggosok Tegel OH U.21 85,000.00
22 Penganyam Bronjong OH U.22 95,000.00
23 Kepala Penganyam Bronjong OH U.23 140,000.00
24 Pemasak Aspal/Buruh Terampil OH U.24 95,000.00
25 Sopir OH U.25 120,000.00
26 Pembantu Sopir OH U.26 95,000.00
27 Mekanik OH U.27 140,000.00
28 Mekanik Pembantu OH U.28 130,000.00
29 Operator Alat Ringan OH U.29 130,000.00
30 Operator Alat Berat OH U.30 140,000.00
31 Pembantu Operator OH U.31 120,000.00
32 Operator Pompa TL OH U.32 85,000.00

Harga Satuan
(Rp)

Keterang
an

Page 2

DAFTAR HARGA SATUAN BAHAN

No. Uraian Satuan Kode

1 2 3 4 4 6
A. BAHAN PASANGAN

1 Batu Kali Alam m3 P.1 120,000.00
2 Batu Kali Belah m3 P.2 120,000.00
3 Batu Kali Keping/Tempel m3 P.3 120,000.00
4 Kerikil Alam 5 - 7 cm m3 P.4 150,000.00
5 Kerikil Pecah 5 - 7 cm m3 P.5 150,000.00
6 Kerikil Pecah 5 - 7 cm (M) m3 P.6 150,000.00
7 Kerikil Pecah 5 - 7 cm (MSC) m3 P.7 150,000.00
8 Kerikil Alam 3 - 5 cm m3 P.8 200,000.00
9 Kerikil Pecah 3 - 5 cm m3 P.9 286,000.00

10 Kerikil Pecah 3 - 5 cm (M) m3 P.10 286,000.00
11 Kerikil Pecah 3 - 5 cm (MSC) m3 P.11 288,000.00
12 Kerikil Alam 2 - 3 cm m3 P.12 306,000.00
13 Kerikil Pecah 2 - 3 cm m3 P.13 302,000.00
14 Kerikil Pecah 2 - 3 cm (M) m3 P.14 302,000.00
15 Kerikil Pecah 2 - 3 cm (MSC) m3 P.15 304,000.00
16 Kerikil Alam 1 - 2 cm m3 P.16 306,000.00
17 Kerikil Pecah 1 - 2 cm m3 P.17 302,000.00
18 Kerikil Pecah 1 - 2 cm (M) m3 P.18 302,000.00
19 Kerikil Pecah 1 - 2 cm (MSC) m3 P.19 310,000.00
20 Pasir Beton m3 P.20 200,000.00
21 Pasir pasang m3 P.21 180,000.00
22 Pasir Urug m3 P.22 130,000.00
23 Tanah urug m3 P.23 50,000.00
24 Kapur Gamping/Labur Kg P.24 2,600.00
25 Kapur Pasang Kg P.25 1,100.00
26 Batu Bata Kls I Buah P.26 750.00
27 Batu Bata Kls II Buah P.27 650.00
28 Semen Warna Kg P.28 17,000.00
29 PC. Merk Tiga Roda (50 Kg) Zak P.29 72,000.00
30 PC. Merk Gresik (50 Kg) Zak P.30 72,000.00
31 PC. Merk Tonasa (50 Kg) Zak P.31 72,000.00
32 PC. Merk Padang (50 Kg) Zak P.32 72,000.00
33 PC. Merk Bosowa (50 Kg) Zak P.33 70,000.00
34 Fuller Kg P.34 15,000.00
35 Tanah Urug Pilihan m3 P.35 86,000.00
36 Sirtu m3 P.36 118,000.00

Harga Satuan
(Rp)

Keterang
an

Page 57

PEKERJAAN LANTAI

1M2 Pasang Lantai Batu Bata 1 Lapis ANL_H.1

No Uraian Kuantitas Satuan Kode
Harga Satuan Jumlah Harga

Pekerjaan (Rp) ( Rp )
1 2 3 4 5 6

I Tenaga
1 Tukang batu 0.060 Hari U.4 85,000 5,100.00

2 Pekerja 0.200 Hari U.6 130,000 26,000.00

II Bahan
1 Batu bata 30.000 Buah P.26 750.00 22,500.00

2 Pasir pasangan 0.035 M3 P.21 180,000.00 6,300.00

Jumlah 59,900.00
Over Head 10% 5,990.00

Total 65,890.00

1M2 Pasang Lantai Floor ANL_H.2

No Uraian Kuantitas Satuan Kode
Harga Satuan Jumlah Harga

Pekerjaan (Rp) ( Rp )
1 2 3 4 5 6

I Tenaga
1 Pekerja 0.1200 Hari U.4 85,000 10,200.00

2 Mandor Pekerja 0.0060 Hari U.5 150,000 900.00

3 Tukang Batu 0.1200 Hari U.6 130,000 15,600.00

4 Kepala Tukang Batu 0.0120 Hari U.7 140,000 1,680.00

II Bahan
1 Semen Warna 1.5000 Kg P.28 17,000 25,500.00

2 PC. Merk Tiga Roda (50 Kg) 0.1860 Zak P.29 72,000 13,392.00

3 Pasir pasang 0.0620 M3 P.21 180,000 11,160.00

Jumlah 78,432.00
Over Head 10% 7,843.20

Total 86,275.20

1M2 Pasang Lantai Keramik 20 X 20 cm ANL_H.3

No Uraian Kuantitas Satuan Kode
Harga Satuan Jumlah Harga

Pekerjaan (Rp) ( Rp )
1 2 3 4 5 6

I Bahan
1 Keramik Lantai 20 X 20 cm 1.050 M2 LT.8 86,000 90,300.00

2 Semen Portland 0.208 Zak P.29 72,000 14,976.00

3 Pasir Pasang 0.045 M3 P.21 180,000 8,100.00

4 semen warna 1.620 Kg P.28 17,000 27,540.00

II Tenaga
1 Pekerja 0.700 Oh U.4 85,000 59,500.00

2 Tukang Batu 0.350 Oh U.6 130,000 45,500.00

3 Kepala Tukang 0.035 Oh U.7 140,000 4,900.00

4 Mandor 0.035 Oh U.5 150,000 5,250.00

Jumlah 256,066.00
Over Head 10% 25,606.60

Total 281,672.60

Page 58

1M2 Pasang Lantai Keramik 30 X 30 cm ANL_H.4

No Uraian Kuantitas Satuan Kode
Harga Satuan Jumlah Harga

Pekerjaan (Rp) ( Rp )
1 2 3 4 5 6

I Bahan
1 Lantai Keramik Kw. I 1.050 M2 LT.8 86,000.00 90,300.00

2 Semen Portland 0.200 Zak P.29 72,000.00 14,400.00

3 Pasir Pasang 0.045 M3 P.21 180,000.00 8,100.00

4 Semen warna 1.500 Kg P.28 17,000.00 25,500.00

II Tenaga
1 Pekerja 0.700 Oh U.4 85,000 59,500.00

2 Tukang Batu 0.350 Oh U.6 130,000 45,500.00

3 Kepala Tukang 0.035 Oh U.7 140,000 4,900.00

4 Mandor 0.035 Oh U.5 150,000 5,250.00

Jumlah 253,450.00
Over Head 10% 25,345.00

Total 278,795.00

1M2 Pasang Lantai Keramik 40 X 40 cm ANL_H.5

No Uraian Kuantitas Satuan Kode
Harga Satuan Jumlah Harga

Pekerjaan (Rp) ( Rp )
1 2 3 4 5 6

I Bahan
1 Lantai Keramik 40x40 Cm 1.050 M2 LT.8 70,000.00 73,500.00

2 Semen Portland 0.200 Zak P.29 72,000.00 14,400.00

3 Pasir Pasang 0.045 M3 P.21 180,000.00 8,100.00

4 Semen warna 1.500 Kg P.28 17,000.00 25,500.00


II Tenaga
1 Pekerja 0.700 Oh U.4 85,000 59,500.00

2 Tukang Batu 0.350 Oh U.6 130,000 45,500.00

3 Kepala Tukang 0.035 Oh U.7 140,000 4,900.00

4 Mandor 0.035 Oh U.5 150,000 5,250.00

Jumlah 236,650.00
Over Head 10% 23,665.00

Total 260,315.00

1M2 Pasang Keramik Dinding 20 X 20 cm ANL_H.6

No Uraian Kuantitas Satuan Kode
Harga Satuan Jumlah Harga

Pekerjaan (Rp) ( Rp )
1 2 3 4 5 6

I Bahan
1 Keramik Dinding 20 x 20 Cm, Motif ( K 1.050 M2 LT.8 86,000.00 90,300.00

2 Semen Portland 0.186 Zak P.29 72,000.00 13,392.00

3 Pasir Pasang 0.018 M3 P.21 180,000.00 3,240.00

4 Semen warna 1.940 Kg P.28 17,000.00 32,980.00


II Tenaga
1 Pekerja 0.900 Oh U.4 85,000 76,500.00

2 Tukang Batu 0.450 Oh U.6 130,000 58,500.00

3 Kepala Tukang 0.045 Oh U.7 140,000 6,300.00

4 Mandor 0.045 Oh U.5 150,000 6,750.00

Jumlah 287,962.00
Over Head 10% 28,796.20

Total 316,758.20

Page 113

1 2 3 4 5 6 7
VII. PEKERJAAN DILUAR BANGUNAN
A. Pekerjaan Bangunan Depan (Lihat Gambar)
1. Pek. Penggantian Reng Kayu Atap Bangunan 4.320 M2ANL_E.17c 27,390.00 118,324.80
2. Pek. Pengantian Genteng Pejaten yg Pecah 6.480 M2ANL_E.17d 27,390.00 177,487.20
3. Pek. Perbaikan Plafond yg Rusak 4.800 M2 ANL_G.6b 127,960.47 614,210.26
4. Pek. Keramik Lantai Samping Bangunan (termasuk P - M2 ANL_H.5 260,315.00 -
5. Pek. Paving Samping Bangunan - ANL_H.8 204,644.00 -
6. Pek. Pengurasan Septictank 1.000 Unit - 700,000.00 700,000.00


B. Pekerjaan Paving dan Taman
1. Pek. Paving Type Bulat ### M2 ANL_H.8 204,644.00 23,514,901.63
2. Pek. Plasteran Miring Plat Beton 93.565 M2 ANL_F.4 67,644.46 6,329,153.53
3. Pek. Acian Pada Plat Beton 93.565 M2 ANL_F.10 41,338.00 3,867,789.97
4. Pas. Bata Pembuatan Taman 10.780 M2 ANL_C.7 128,358.12 1,383,700.53
5. Plasteran Pas. Bata Pembuatan Taman 7.762 M2 ANL_F.4 67,644.46 525,029.21
6. Pas. Bata Pengunci Paving 7.917 M2 ANL_C.7 128,358.12 1,016,211.24
7. Pek. Plasteran Pas. Bata Pengunci Paving 3.167 M2 ANL_F.4 67,644.46 214,216.46
8. Urugan Tanah Humus (Tanpa Pemadatan) 3.791 M3 - #REF! #REF!
9. Penanaman Bunga pada Taman 2.000 Pkt - 200,000.00 400,000.00

#REF!

Page 114

REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN :

PEKERJAAN :

LOKASI : KOTA BIMA

SUMBER DANA : DBCHT 2014

TAHUN ANGGARA : 2014

NO URAIAN PEKERJAAN JML HARGA
1 2 3


I. PEKERJAAN PERSIAPAN 350,000.00


II. PEKERJAAN TANAH DAN PONDASI 11,058,000.15


III. PEKERJAAN BETON DAN DINDING 86,166,310.64


IV. PEK. ATAP, PLAFOND, DAN LANTAI 44,455,865.05


V. PEKERJAAN FINISHING & LISTRIK 12,483,474.68


VI. PEKERJAAN PENGUNCI DAN LAIN-LAIN #REF!


VII. PEKERJAAN DILUAR BANGUNAN #REF!





A REAL COST #REF!
B PPN 10% = 10% X A #REF!
C JUMLAH = A + B #REF!
D PEMBULATAN #REF!

Terbilang :
#VALUE!

Bima, Februari 2015
Diperiksa Oleh : Di hitung Oleh :

KABID CIPTA KARYA DINAS PEKERJAAN UMUM,PTP DINAS PEKERJAAN UMUM,KONSULTAN PERENCANA
PERTAMBANGAN DAN ENERGI KOTA BIMAPERTAMBANGAN DAN ENERGI KOTA BIMACV. ATLANTA Konsultan

SUHARDIN, ST M. SYAHLAN, ST JEFRI SANI, ST
NIP. 19740909 200312 1 007NIP. 19760224 200901 1 003Pimp. Perwakilan

Mengetahui : Disetujui Oleh :
KEPALA DINAS KESEHATAN KEPALA DINAS #REF!

KOTA BIMA #REF! #REF!

#REF! M. NUR H.A. MAJID, MH #REF!
#REF! #REF!

PENINGKATAN DERAJAT KESEHATAN
MASYARAKAT DENGAN PENYEDIAAN
FASILITAS PERAWATAN KESEHATANPEMBANGUNAN RUANG KONSULTASI
PENYAKIT DAMPAK AKIBAT ROKOK DI
PUSKESMAS MPUNDA (DBH-CHT)

P E M E R I N T A H K O T A
B I M AD I N A S K E S E H

A T A N
Jl. Soekarno - Hatta No.66

Kota Bima

Similer Documents