TitleBuilding Quantities Explained
File Size1018.6 KB
Total Pages12
Document Text Contents
Page 1

L

Building Quantities

Explained

IVOR H. SEELEY
Formerly Emeritus Professor of Nottingham Trent University

In collaboration with

Roger Winfield
Director of Studies

Department of Surveying
The Nottingham Trent University

Fifth Edition

Page 2

Contents

List of Figures
List of Examples
List of Tables
Preface to the Fifth Edition
Acknowledgements

xi
xiii
xiv
xv

xviii

1 General Introduction 1

Historical background of quantity surveying; functions of bill of
quantities; contract documentation; processes used in quantity
surveying work; other measurement approaches; Standard
Method of Measurement of Building Works; coordinated project
information; other functions of the quantity surveyor; changes
in quantity surveying techniques.

2 Measurement Procedures 16

General rules: basic principles; tabulated rules; dimensions paper;
measurement procedures; entering dimensions; spacing of
items; waste; order of dimensions; timesing; abbreviations and
symbols; grouping of dimensions; deductions; measurement of
irregular figures; alterations to dimensions; figured dimensions;
numbering and titles of dimension sheets; order of taking off;
adjustment of openings and voids; descriptions; use of metric
symbols; extra over items; deemed to be included items; accur-
acy in dimensions; falls, crossfalls and slopes; drawn information;
use of schedules; take off lists; query sheets; preambles; prime
cost items; provisional sums; work of special types; fixing, base
and background; cO(llposite items; general definitions; services
and facilities; plant items; standard components.

3 Mensuration Applications 37

Introduction; girth of buildings: rectangular buildings; buildings of
irregular outline; measurement of areas: irregular areas; trape-
zoids; segments; bell mouths; measurement of earthworks: slop-
ing site excavation; cuttings and embankments; measurement
of pitched roofs: lengths of rafters; lengths of hips and valleys;
roof coverings.

Page 6

I

I
I
,I

Index

abbreviations 21
listing 379-89

abstract sheets 347
abstracting

general rules 348-50
subdivisions 347-8
transfer of dimensions 347
use of computers 369-71

activity bills 377
air ducts, underfloor 105
aluminium rainwater goods 153
approximate quantities 16
architraves 241
areas, measurement 40-43
asphalt roof coverings 156

worked example 187-91

background 1-2
barge boards 156
basement excavation 56
bellmouths 43
bill of quantities

activity 377
-alternative formats 375-8
annotated 377
as contract document 4, 5
elemental format 375, 376
Final Summary· 355
General Summary 355
operational 376-7
purposes 2-3
specialist 358

billing 4-6, 350-53
checking stages 353
direct 344-5
entering quantities 352

400

general rules 352-3
item referencing 351
units of measurement 352
use of computers 366, 369-71

billing paper 5, 350-51
rulings 350-51

biotec plant 313
block partitions 123
block walling see brick and block

walling
boilers 276-7
brick and block walling

categories 76-7
deductions 80-81
eaves filling 79
external 77-8
facework 60
facework quoins 81
in footings 59
internal 78
measurement 76
ornamental bands 81
projections 79-80
rough and fair cutting 79
worked examples 84-103

brickwork, chimney breasts and
stacks 104-105

British Steel Strip Products 83
Building Cost Information Service

(BClSl, element divisions 375,
376

BUilding Employers Confederation 7
building girth, mensuration 37-40
built up felt roof covering 157

worked example 180, 181-6
Burlington slate ridge vent 151, 152
Burlington slate vent 151,152,153

Page 7



cable trunking and tray 297
cables 297

in final circuits 297-8
cast iron rainwater goods 153
CA TO (computerised billing

program) 366
CATOPro (revised version) 366, 375

ceiling finishes 193-4
cesspools/pits 313-14
chimney breasts and stacks 79,

104-105
chimney pots 105
cisterns see water storage tanks
Civil Engineering Standard Method of

Measurement (CESMM) 5
classification tables 17
Common Arrangement of Works

Sections for Building Works
(CAWS) 7,8,9,272

compacting, trench excavation 55
component drawings 31
composite items, billing 35
composite walls 82
computers, and bill production

366-73
concrete

beds 120
flags/paving slabs 339
foundations 57-8
manholes/inspection

chambers 310
p recast floo rs 121
precast kerbs and channels· 331
slab floors 120
suspended floors 121

conditions of contract 3
conduit

electrical 296
in final circuit 297-8

contamination check 51
contract documentation 3-4
contract drawings 4
contract sum 5
control lists 367
Coordinated Project Information

(CP!) 8-12
Co-ordinating Committee for Project

Information (CCP!) 7, 8:-:9 _

Index 401

crossfalls, definitions 30
cultivating 331
curved work, measurement 35
cut and shuffle system 19, 360

merits/demerits 363-4
procedure 360-63

cuttings, measurement 46-8

damp-proof courses 60-61
daywork charging 357-8

schedule 359
decorating 198
deductions, entering 22
deemed to be included items 29
default bill preferences 369
description column 19
descriptions 26

order and form 26-7
varying practices 27
see also standard descriptions

dimension column 19
dimensioned diagrams 31
dimensions paper 4, 18-19

altering data 23
altering dimensions 23
descriptions 26-8
entering data 19-22
entering deductions 22
entering irregular data 22-3
figured dimensions 24
grouping of descriptions 21
number of units 27-8
numbering and titling 24
order of entries 20
similar items 28
spacing of items 19
timesing 20
waste 19,20

direct billing see billing, direct
disposal systems 272

drawings 272-3
see also waste services

distribution boards 298
door schedule 245
doors 240

adjustment of openings 241-2
external 252

Page 11

L

quantity surveyor
changes in techniques 14-15
client's 12-13
contractor's 13-14
origins 1-2
training 14-15

query sheets 32
quoins 81

rafters
length measurement 48-9, 145
spacing 145

rainwater goods 153, 155-6
schedule 316

Redland DryVent ridge 148, 149
reduced levels, excavation 52
RedVent eaves ventilation 148, 149
rei nforcement

bar 121
fabric 121

risers 261
roadworks 330-31

worked example 334-40
rock, definition 53
rodding eye, sealed 308-309
roof construction

timbers 144-5
trusses 145
void ventilation 148-53

roof coverings
flat roofs 156-7
measurement 50
pitched roofs 145-7
profiled metal sheeting 147-8
sheet metal 157

Royal Institute of Chartered Surveyors
(RI CS) 1, 7, 14

Building Cost Information
Service 373

Royale sheets 147
rubble work 106

worked example 112-16

sanitary appliances 275
Scan roof 147
schedules, using 31-2
screeds 197
seeding, worked example 341

Index 405

segments, measurement 41-3
selective tendering 378
septic tanks 313
services and facilities

billing 35
builder's work in connection with

275
measurement order 272
worked example 280-95

setting up, use of computers 366-7
sewage disposal/treatment plant

313-15
sewer connections 312
sheet metal roof covering 157
shingles, wood 146
shrubs 331

worked example 341
sidecasts 19
Simpson's Rule 46
site preparation 52
site visits, preliminary 51
skirtings 197
slates 146
slopes, definitions 30
sloping site excavation, measurement

44-5
soakaways 314
soffit boards 156
solid floors 120-21
special work types, identification 34
specialist bills 358
specification 3-4
spot items 51
squaring column 19
squaring dimensions 345-7
staircases

metal 263
standard timber 262-3
timber 261-2
worked example 268-71

standard components, billing 36
standard descriptions, graded

format 364-5
Standard Method of Measurement of

Building Works (SMM) 6, 7
1988 edition (SMM7) 7-8
code of procedure for

measurement 10

Page 12

406 Index

Standard Method of Measurement of
Building Works cont'd

General Rules 16-17
Library of Standard Descriptions

11-12
tabulated rules 17-18
units of measurement 5

stone rubble walling see rubble work
stonework measurement, around

windows 218
stud partitions see dry partitions
substructure work 59-61
supplementary rules 18
surface treatments, excavations 55
suspended concrete slab floors 121
switchgear 298
symbols, standard 21

take off lists 32
taking off 4

adjustment for voids 25
descriptions 26-8
metric symbols 28
sequence 24-5
use of computers 367-9

technical surveyor 14
tendering arrangements 4, 378
thatching 146
tiles, roof 145-6
timber

basic sizes 118
in roof construction 144-5
strength classes 117, 144
stud partitions 123, 124

timesing column 19, 20
_ see also squaring dimensions

topsoil, handling 52
trade system see Northern method
trapezoid (trapezium),

measurement 41
treads 261
trees 331

guards 331
removal 52
w6r~ed'eXa,mple 342

.' ~.,.< "\ ~~ .. ,' . .':;:; .

.....

trial pits and boreholes 51
trussed rafter slated roof, worked

example 172-9
turfing 331

worked example 341

units of measurement, standardised 5

valleys, length measurement 49
vents 105-106
vulnerable materials, definition 35

wall cladding see metal sheet cladding
wall finishes' 195-6
wallpaper hanging see paper hanging
walls

composite 82
see also brick and block walling

Ward Cladding Systems (moduclad
panels) 83

waste (on dimensions paper) 19, 20
waste services

schedules 275-6, 282
worked example (house

drainage) 315-29
water main connections 273
water services

pipes 272-3
schedules 275-6
worked example 280-95

water storage tanks 274
WC fittings 275
window schedules 218, 221
windows 216-17

adjustment for openings 217-18
metal casement 234, 235-8
order of measurement 216
standard products 217
wood casement 220, 222-32

wood casement windows 220
worked example 222-32

work sections 347
working space allowance 53
working up 4, 344

modified procedures 358